Ross continues to keep things on track and moving with the Great Hall! Our foundation is installed, our plumbing groundwork complete, the lower-level concrete slab is curing in preparation for the timber frame raising.














Ross continues to keep things on track and moving with the Great Hall! Our foundation is installed, our plumbing groundwork complete, the lower-level concrete slab is curing in preparation for the timber frame raising.













© 2021-25 St. Dunstan's Academy. All rights reserved. Web design by Studio JWAL LLC.
